Unpopular opinion: labeling every line at the box cut my callback trips from 4 a month to zero | Cable Installers - Freelance Forum - The Community for Independent Professionals
Unpopular opinion: labeling every line at the box cut my callback trips from 4 a month to zero
Six months back I was doing maybe 4 or 5 callbacks a month, mostly because nobody could tell which coax went where after I left. I started writing a tiny tag and room name on each drop right at the splitter, takes like 20 extra seconds per line. Last month I ran 38 installs and got zero callbacks about crossed lines, which never happens for me in summer. My lead tech even asked what I changed because the next guy on a trouble ticket stopped calling him confused. It's not fancy, just a Sharpie and some tape, but it adds up over a route. What do you all write on yours, or do you skip it and trust the next tech to tone it out?