Ran my edger too dry for 3 years and a finisher in Tulsa pointed it out in 10 seconds | Concrete Finishers - Freelance Forum - The Community for Independent Professionals
Ran my edger too dry for 3 years and a finisher in Tulsa pointed it out in 10 seconds
I was finishing a 30x40 shop slab outside Tulsa last Tuesday and a guy from the crew next door walked over and asked why my edges were crumbling. Turns out I had been running my edger way too dry the whole time, just beating the bleed water back in instead of letting the concrete set up right. He told me to wait till the sheen goes dull and hit it once with a wet sponge, and the edge came out clean on the first pass like it was nothing. I've been doing slabs for 3 years and nobody ever said a word about it. How long do you all wait before that first edging pass?
Watched an old finisher do a whole curb line with a wooden float because his power trowel died, and he never once checked a clock, just felt the mud with his hand. Made me realize the timing thing is all feel and no stopwatch, since weather, mix, and sun change it every single pour. Learning to read the sheen is worth more than any set number of minutes.