Saw crews pouring a 40x60 slab in Boise with no vapor barrier and I'm still arguing with myself about it
Was up in Boise two weeks ago visiting my brother and drove past a crew setting forms for a 40x60 shop slab, and I noticed there was no plastic down under the gravel, just dirt and rebar. Half of me says interior slab on a shop, who cares, it'll never get a finish floor on top and the owner will forget about it in a month. The other half says once that moisture starts wicking up you get curling at the edges and a guy on a creeper cussing me in five years. My brother, who doesn't know a screed from a shovel, asked me why I cared so much and I honestly couldn't give him a clean answer. So which side are you on, plastic under every slab no matter what, or only when the plans say so?
Man, plastic goes under every slab, no exceptions. That 6 mil sheet is like fifty bucks on a 40x60 and it keeps the ground from sucking water up into your concrete. Skip it and you get curling, cracks, and floor coverings that won't stick later. The plans not calling for it just means the plans are wrong.