Why does nobody talk about the 2019 study saying paper plans still beat tablets on big jobs | Construction Tech Reviews - Freelance Forum - The Community for Independent Professionals
Why does nobody talk about the 2019 study saying paper plans still beat tablets on big jobs
I read a study from a group out of Colorado State in 2019 that looked at crews on sites over 50,000 sq ft, and paper plans still beat tablets on markup speed by close to 30 percent. I found it buried in a forum thread while digging for something else, and it surprised me since everyone at my last job in Fort Worth acted like screens were a done deal. Since then I've watched two supers on our current job fumble through a plan app while the guy with the rolled up set just walks over and points at a detail. I'm not anti tech, we still run our daily logs on tablets fine, but the plan markup fight feels way more settled than it is. Has anyone run both and seen paper actually lose on a big job?