26
Got called out on my detail callouts by a senior checker
Honestly, I was doing a set of steel shop drawings and the checker wrote 'This is a fabrication drawing, not a puzzle' right on my PDF. He said my callouts were jumping all over the sheet, making the welders hunt for info. I changed my whole system that day, now I group all notes and flags for each piece in one clear zone on the sheet. Has anyone else had a checker give them that kind of blunt, helpful fix?
4 comments
Log in to join the discussion
Log In4 Comments
caseywalker3h agoMost Upvoted
@thomas.river Had an old boss who numbered his callouts by weld size instead of location, drove everyone crazy until the shop floor mutinied.
5
thomas.river2mo ago
But what if the puzzle has a logic to it? I get what @vera29 is saying, but sometimes the order tells the story of how it's built.
3