F
2

My boss told me to always dimension from the same origin point on a complex assembly drawing.

He said it prevents cumulative error, and after a project in Cincinnati where a 0.02 inch mismatch snowballed into a half-inch gap on site, I get it. Do you think this rule is always worth the extra setup time, or are there times where a different method is faster and just as good?
3 comments

Log in to join the discussion

Log In
3 Comments
iris_barnes87
That Cincinnati story is why I'd just do what the boss says.
3
the_ben
the_ben9d ago
But what if doing what the boss says gets someone hurt? That Cincinnati story had real consequences. Where do you draw the line?
4
paulnguyen
Yeah, until the boss is wrong.
3