F
11

Changed my mind about flat-rate pricing after a bathroom reno last month

I used to think flat-rate was just a way to hide hourly bloat, but my neighbor had this tiny bathroom gut job in Austin where I bid $2,800 flat. Three days in, the wall tile cracked from a plumbing leak behind it and I had to rip out and re-do a whole section. Under hourly I would have been eating that time arguing, but my flat bid had a 10% cushion built in so I just handled it and the client was thrilled. Has anyone else found that flat-rate actually smooths over those nightmare surprises better than hourly?
2 comments

Log in to join the discussion

Log In
2 Comments
val974
val97418h ago
Flat-rate just hides how much you overpay on easy jobs.
2
drews55
drews5520h ago
that wall tile crack from a plumbing leak" is exactly the kind of thing that makes flat-rate look genius. I did a similar master bath flip in Denver last year, bid $3,500 flat with a 12% cushion, and halfway through found the old subfloor was rotted under the shower pan. Had to rip it all out and replace it, cost me a full extra day and $200 in materials. Client never knew, just saw I was on time and under budget. Flat-rate absolutely makes those hidden headaches way easier to swallow.
-1